Wrong Stone Grade
Skipping gradient assessment risks aggregate too fine or too coarse, leaving a surface that polishes smooth under foot traffic on slopes.
Gradient-Matched Aggregate
The contractor selects stone particle size based on the specific gradient and traffic load, confirmed in the written scope before installation begins.