Tubing Placed Too Late
Tubing laid on top of a compacted base rather than set into it shifts under load, creating hot spots and cold gaps across the surface.
Sub-Base Integration
The contractor sets tubing into the sub-base layer before the resin is poured, locking spacing and depth permanently.